Wednesday, April 23, 2014

Floorless work!


Work continues apace at Saluki.  The infill section which finishes off the cab is in progress - this uses part of the rear frame from the donor roof, and part of the existing rear side doors.
How it will look with the new rear wings

Rear cross member will be replaced with a tube

Composite infill panel to rear of cab in progress

3 comments:

Grumpy Goat said...

Big rear overhang you have there, Mr Dog. Hope it's high enough not to catch on rough ground.

Ian the Dog said...

I think it's about 100mm extra, to cover the length of the spare wheels in their new location. But it's quite high, don't think there's a problem.

Unknown said...

I think it covers High location and wheels on their high location. But according to me there is no problem to use it.
Workshop Equipment